Standing testimony to the quality and reliability of White and Bright are its clientele, who have enlisted the company as a major agency for Erection and Overhauling works in India and UAE.
| Slno | Nature of job | Client | Consultant/Contractor | Year |
|---|---|---|---|---|
| 1 | Installation services for replacement of spring hangers pipe supports of waste water heat recovery boilers at ‘E’ station, Phase-1, Jebel Ali | DEWA/LISEGA | WB | 2019 |
| 2 | Installation of additional isolation valves at L-2 station, JAPS | DEWA/SIEMENS | VOICE | 2019 |
| 3 | DCS migration installation works at ‘K’ station, DEWA, JAPS | DEWA | VOICE | 2019 |
| 4 | Design, Supply, installation, testing & commissioning of new electromagnetic flow meter for water reservoirs inlet line in ‘E’ station, DEWA, JAPS | DEWA | VOICE | 2019 |
| 5 | Replacement of existing pulse air control system including supply, installation, commissioning, testing and supply of necessary materials for two gas turbines GT- E2 & E3 | DEWA | VOICE | 2019 |
| 6 | Supply, fabrication & installation of chiller pipeline, pumps and electrical works | Rashid Al Mansoori Electromechanical LLC | WB | 2019 |
| 7 | Chlorine dioxide (ClO2) system for ‘E’ station, DEWA, JAPS | DEWA | VOICE | 2019 |
| 8 | Supply of cable, cable pulling, termination and associated Mechanical - Electrical works for CEMS at Al Aweer Gas Turbine Power Station – Phase -1 | DEWA/MHPS | VOICE/ Bilfinger Tebodin | 2019 |
| 9 | Installation of MORE Catfis machine | EMIRATES STEEL | WB | 2019 |
| 10 | Supply, fabrication and installation of safety platform for ladle turret in SMP-2 | EMIRATES STEEL | WB | 2019 |
| 11 | Steam, feed water & CCCW system drain and vent valves replacement work – ‘K’ station, DEWA, JAPS | DEWA | WB | 2019 |
| 12 | Scrap Car Rail Extension | EMIRATES STEEL | WB | 2019 |
| 13 | SMP3 Combustion Chamber Wall Repairing | EMIRATES STEEL | WB | 2019 |
| 14 | Design and installation of Wet Compression system for GT#6 at Al Aweer power plant, DEWA | DEWA/MHPS | VOICE | 2018-19 |
| 15 | Supply & installation of caustic soda transfer pipeline from demineralization plant chemical preparation area to blending plant in ‘M’ station, DEWA, JAPS | DEWA | VOICE | 2018-19 |
| 16 | Design, Fabrication, Supply, Installation & Load Testing of Lifting Device at ‘M’ station, DEWA, JAPS | Siemens/DEWA | WB | 2018-19 |
| 17 | Fine Filter Installation work at H station, Al Aweer, DEWA, JAPS | Siemens/DEWA | WB | 2018 |
| 18 | Hypochlorite pipeline relocation work at ‘E’ station, DEWA, JAPS | Accion-Besix Agua JV | WB | 2018 |
| 19 | Repairing of SMP1 EAF Slag Pit | Emirates Steel | WB | 2018 |
| 20 | Distillate & DM Water Interstation Transfer Facility Between L&M Stations | DEWA | WB | 2018-19 |
| 21 | Supply & replacement of old control panels of at DEWA CBCH 132 KV, Al QUOZ 132 KV & NAJM 400 KV substations. | DEWA | WB | 2018 |
| 22 | Replacement of RO injection line with CPVC pipes & fittings at L station ClO2 plant, DEWA, JAPS. | DEWA | WB | 2018 |
| 23 | Flushing of GRE DMW forwarding line, SS injection piping, spray rack piping and cleaning of spider nozzles in GT#11, 12, 21, 22, 31 & 32 at M station Wet Compression. | DEWA/SIEMENS | WB | 2018 |
| 24 | Ventilation system modification in GT#12, ‘G’ station, DEWA, JAPS | DEWA/SIEMENS | WB | 2018 |
| 25 | Design, fabrication, supply, installation and load testing of 06 no’s of lifting device structure at DEWA, JAPS | DEWA/SIEMENS | WB | 2018 |
| 26 | Overhauling of Power Station and Desal units (Turbine-Generator, Pumps, Fans, Motors, APH, Valves etc.) at Jebel Ali and Aweer Power Projects | DEWA | WB | 2016 |
| 27 | Design, supply, installation, testing and commissioning of Wet Compression system auxiliaries at H3 station, Al Aweer | DEWA/SIEMENS | WB | 2015 |
| 28 | Removal of mesh from air intake duct in 17 Gas Tubines (M station, L station & H station) | DEWA/SIEMENS | WB | 2015 |
| 29 | The installation HPH system consists of NG skid, Diesel oil skid, Hydraulic skid, Noise enclosure, ventilation system and associated pipe work in G station | DEWA/SIEMENS | WB | 2015 |
| 30 | Design, supply, installation, testing and commissioning of Wet Compression system auxiliaries at M station, Jebal Al | DEWA/SIEMENS | WB | 2015 |
| 31 | Capacity enhancement of DM water plant at D station, Jebel Ali | DEWA/SIEMENS | WB | 2015 |
| 32 | Replacement of Small bore in NG system pipe line in ‘E’ station | DEWA | WB | 2014 |
| 33 | Design, supply, installation, testing and commissioning of Wet Compression system auxiliaries at L station, Jebal Ali | DEWA/SIEMENS | WB | 2014 |
| 34 | Capacity enhancement of DM water plant at E station, Jebel Ali | DEWA | WB | 2014 |